Showing posts with label march. Show all posts
Showing posts with label march. Show all posts

Haynes Project 50 Update for the weeks of March 7th and 14th

| 0 comments |
Hello from the Haynes Project 50 Team! Over the next two weeks, well be working on the following as we restore a 65 Mustang convertible in time for the 2011 SEMA/AAPEX show:

1. The interior quarter trim panels and steering column shroud are being stripped and repainted.

2. The steering gearbox is being cleaned and resealed.

3. The front suspension components are being refinished and re-bushed.

4. The rebuilt engine is receiving its final touches: Wire-wheel and refinish the exhaust manifolds, install the new water pump and drive in the new freeze plugs.

Let us know if you have any questions and watch us live on the Mustang Garage Cam!
Read More..

Haynes Project 50 Update for the weeks of March 21st and 28th

| 0 comments |
Thanks for visiting the Haynes Project 50 Blog! Heres a summary of the Project 50 Team activities over the next two weeks:

1. Final assembly of the suspension and steering system to the car

2. Final assembly of the transmission

3. Beginning interior reassembly

Be sure to take a look at the Mustang Live Garage Camera to watch the restoration work live during business hours. Ask us any question or leave us a comment about the work. Till next time, the Haynes P50 Team
Read More..